Hydraulic field study · c. 1380
The Divided Millrace
Two timber gates share one upstream waterline. Raise the downstream sills and watch the branch discharge separate.
Flow comparison
Shared head
Lower sill · 1.15 m
0 L/s
Higher sill · 1.45 m
0 L/s
Drag to orbit · Shift/right-drag to pan · Wheel to zoom · R resets
SHARED WATERLINE1.70 m
LOWER SILLOW1.15 m · deeper head
HIGHER SILLOW1.45 m · reduced head