Roof catchment
120 m²
Rainfall total
45 mm
Rain duration
4 h
Mean intensity
11.25 mm/h
Runoff coefficient
0.85
Tank A / Tank B
1,500 L each
Initial storage
600 L
Demand rate
300 L/h
Display period
12 h
Gross rain = 45 mm × 120 m²
= 5,400 L
Collectible runoff = 5,400 × 0.85
= 4,590 L
Runoff loss = 5,400 − 4,590
= 810 L
1 mm falling on 1 m² equals 1 L. The model assumes no evaporation,
infiltration, or additional pipe losses.
Final balance at 12 h:
600 L initial + 4,590 L runoff
= 3,600 L demand + 990 L overflow
+ 600 L remaining storage.