Field Repair Challenge
Reuse the exact kit on the river. No extra parts will be issued.
Route inspection
The original crossing is structurally valid. Inspect it before the closure event.
Pre-closure inspection
All six bays are connected, and short piers P1, P3, and P5 support the route. The worksite has warned that support point P3 may be lost to flooding.