Two ways to make the same thing
Pick a workshop.
Watch the cost curve turn.
Block Studio has lower rent but higher unit cost. Assembly Hall asks for more upfront investment, then saves money on every item.
Cost stack
Fixed cost
Variable cost
BLOCK STUDIO
ASSEMBLY HALL
COST CROSSOVER
92.3 UNITS
92.3 UNITS
DEMAND 80
DRAG TO ORBIT · SCROLL TO ZOOM · DOUBLE-CLICK TO RESET