Weighted Graph / Dijkstra
Shortest cost, not shortest distance
Edge costs are independent weights. Geometric length is the measured
distance between endpoints. The route is computed at runtime.
Source A
Target G
7 nodes · 10 links
Least-Cost Path
Summed edge cost
Path geometric length
Algorithm
Dijkstra
Visual encoding: edge length is geometric distance;
edge thickness and labels represent cost. All listed costs are nonnegative.
Edge costs and geometric lengths
| Edge |
Cost |
Geometric length |
Lengths are Euclidean distances between edge endpoints in scene units.
Highlighted rows belong to the least-cost path.