Route one bounded rope through the workshop’s fixed pulley sockets.
Find the arrangement that gives the bridge enough idealized lifting force.
Your rope route
Rope required
0.0 / 27.0 m
Bridge support
0.0 / 4.0 T
Build the route
Select pulley sockets in travel order, then click anchor A.
Click sockets in the 3D workshop. Drag to orbit, right-drag to pan,
and use the wheel to zoom.
U undo · R clear · H solution